In a typical hard wired motor start and stop circuit (called a control circuit) a motor is started by pushing a "Start" or "Run" button that activates a pair of electrical relays. The "lock-in" relay locks in contacts that keep the control circuit energized when the push button is released. (The start button is a normally open contact and the stop button is normally closed contact.) Another relay energizes a switch that powers the device that throws the motor starter switch (three sets of contacts for three phase industrial power) in the main power circuit. Large motors use high voltage and experience high in-rush current, making speed important in making and breaking contact. This can be dangerous for personnel and property with manual switches. The "lock in" contacts in the start circuit and the main power contacts for the motor are held engaged by their respective electromagnets until a "stop" or "off" button is pressed, which de-energizes the lock in relay.[10]
Le test continu, grâce à l’automatisation, s’intègre dans le processus  de développement et de distribution des logiciels afin d’obtenir le plus rapidement possible des retours sur les risques associés à chaque nouvelle version. L’implémentation de tests automatisés  permet de faire face à la complexité et au rythme accrus de développement et de livraison d’applications.
Enfin, à vos premières exécutions et dans la mesure du possible, vérifiez visuellement ce qui se passe, quitte à mettre des points d'arrêt (breakpoint). Cela peut paraître bête, mais toutes les exceptions soulevées par les drivers ne sont pas toujours très explicites (voire inexistantes mais c'est parfois justifié !). Attention néanmoins au breakpoint, vous pouvez casser la synchronisation des événements, idem si vous prenez le focus sur la fenêtre du navigateur si vous êtes en local !
But the code wants to run all at once, in a millisecond. By the time IE actually loads the page of search results, the entire subroutine is long over. We have to slow things down and wait for the browser while its navigating. We could use something like Application.Wait(Now + TimeValue("00:00:05")) to wait 5 seconds, but if the page loads faster we’re wasting time waiting for nothing, and if the page takes longer we’re in the same pickle as before. Do While objIE.Busy = True Or objIE.readyState <> 4: DoEvents: Loop is an elegant Do...Loop solution consisting of 3 VBA statements we’ve tidied up on one line, using colons (:) to connect them. It’s saying: while IE is busy navigating, just sit here and run in circles. objIE.Busy = True and objIE.readyState <> 4 (<> means not equal) are essentially the same thing –one could probably be ommitted– but just to make sure the page is really done loading we make both of these conditions requirements for getting out of the loop, by using the logical operator Or. The DoEvents part is technically not needed but we add it in the loop to free up processing resources and allow other things to happen within Excel during this time, asynchronous to the running loop. For the over-achievers out there, here are some other ways we could have written this line of code to do the same thing.

Automation of homes and home appliances is also thought to impact the environment, but the benefits of these features are also questioned. A study of energy consumption of automated homes in Finland showed that smart homes could reduce energy consumption by monitoring levels of consumption in different areas of the home and adjusting consumption to reduce energy leaks (such as automatically reducing consumption during the nighttime when activity is low). This study, along with others, indicated that the smart home’s ability to monitor and adjust consumption levels would reduce unnecessary energy usage. However, new research suggests that smart homes might not be as efficient as non-automated homes. A more recent study has indicated that, while monitoring and adjusting consumption levels does decrease unnecessary energy use, this process requires monitoring systems that also consume a significant amount of energy. This study suggested that the energy required to run these systems is so much so that it negates any benefits of the systems themselves, resulting in little to no ecological benefit.[54]
Vous pouvez également définir la valeur basée sur les variables off qui ont des valeurs mémorisées. Par exemple, si vous lisez du texte à partir d’un fichier et que vous le stockez dans une variable, vous pouvez alors utiliser cette variable pour entrer du texte dans des boîtes de dialogue de type texte. Ceci est utile lorsque le texte de la zone de texte change à chaque fois que vous exécutez le bot.
As demands for safety and mobility have grown and technological possibilities have multiplied, interest in automation has grown. Seeking to accelerate the development and introduction of fully automated vehicles and highways, the United States Congress authorized more than $650 million over six years for intelligent transport systems (ITS) and demonstration projects in the 1991 Intermodal Surface Transportation Efficiency Act (ISTEA). Congress legislated in ISTEA that "the Secretary of Transportation shall develop an automated highway and vehicle prototype from which future fully automated intelligent vehicle-highway systems can be developed. Such development shall include research in human factors to ensure the success of the man-machine relationship. The goal of this program is to have the first fully automated highway roadway or an automated test track in operation by 1997. This system shall accommodate installation of equipment in new and existing motor vehicles." [ISTEA 1991, part B, Section 6054(b)].
5. HITEMA – Groupama Gan Vie L’automatisation des tests fonctionnels SIMON Emeline 4 I. La phase de recette dans un projet Dans cette première partie, nous allons tout d’abord comprendre la notion de projet et ce qu’elle représente. Au sein de celui-ci, il est nécessaire de réaliser des tests mais pas à n’importe quel moment. C’est pourquoi, après avoir détaillé le système de projet et l’importance des tests, je développerai l’étape de préparation de recette et des plannings. Enfin, je détaillerai l’étape suivante qui est l’exécution de recette et les suivis d’avancements réalisés pendant cette phase. A. Pourquoi et à quel moment réaliser des tests ? 1) Les différentes méthodes de projet et les différents types de tests. Il existe plusieurs méthodes de gestion de projet et chacune sans exception possède une phase de tests. Elles ont bien évidemment des avantages et des inconvénients. Ayant pour expérience de travail la méthode linéaire, je développerai la suite de mon mémoire en me basant sur cette méthode. La méthode linéaire (ou « cycle en V ») : Cette méthode est classique en gestion de projet : c’est une succession de phases permettant d’aboutir au résultat final. Chaque phase ne chevauche pas sur la précédente ou la suivante : 1 – Source : http://www.ice-tech.fr/fr/p/domaines-interventions Cette méthode est assez rigoureuse est nécessite une organisation précise. Ses avantages sont : - Normalisation des étapes de développement - Rédaction de spécification pour les développements mais aussi pour les tests - Les tests sont effectués dans un environnement stable
cents ans. Mais les outils numériques peuvent influencer leur mise en œuvre. Par exemple, pouvoir fournir immédiatement un retour pertinent à un élève lors de la réalisation d’une série d’exercices peut favoriser le processus d’automatisation. De même, pour comprendre un phénomène dynamique complexe (comme le galop du cheval), le fait de pouvoir […] Lire la suite☛ http://www.universalis.fr/encyclopedie/apprentissage-avec-le-numerique/#i_2513
×